A uniform cable of mass and length is placed on a horizontal surface such that its part is hanging below the edge of the surface. To lift the hanging part of the cable upto the surface, the work done should be:
Let us begin by noting that the cable is uniform, so its mass per unit length (linear mass density) is constant. We denote this density by and write
because the total mass is uniformly distributed along the total length .
According to the statement, a fraction of the cable hangs below the horizontal surface. Hence the vertical length that is hanging is
We choose the horizontal surface as the reference level . Positive is taken upward, so the hanging portion originally lies at negative values of . Every small element of cable located at a distance below the surface (that is, at between and ) has to be raised through a height equal to the absolute value of its initial coordinate, namely .
Let us label a small element of length on the hanging part. Its mass is
Initially this element is at a coordinate (negative), so it must be lifted through a vertical distance to reach the surface. The elementary work required to lift this element is given by the basic work formula
Substituting and , we have
Because runs from (bottom of the hanging part) up to (surface), the total work is obtained by integrating over this interval:
We now carry out the algebraic steps of the integration:
Evaluating the definite integral, we get
Substituting this back,
Thus the work needed to raise the entire hanging part of the cable to the level of the surface is
Comparing this result with the given options, we see that it matches Option A.
Hence, the correct answer is Option A.
Tagged Work done by constant and variable forces. Machine-assigned, so read it as a strong shortlist rather than a verdict.