RankRizz
JEE MAIN 2026 · 23 JAN S1+4 / −1EASYTRANSCRIBED

JEE Main 2026 Mathematics question — Cubic and higher degree polynomial equations

A building construction work can be completed by two masons A and B together in 22.5 days. Mason A alone can complete the construction work in 24 days less than mason B alone. Then mason A alone will complete the construction work in :

SOLUTION

Let the time taken by A to complete the construction be aa days. Then B’s time = a+24a + 24 days.

If the total work is say 1 unit, then work done by A in one day is 1a\frac{1}{a} units , and work by B is 1a+24\frac{1}{a+24} units.

Given, 1a+1a+24=122.5\dfrac{1}{a} + \dfrac{1}{a+24} = \dfrac{1}{22.5} [work done by A in one day+ work by B in one day= total work done in one day]

or, (a+24)+aa(a+24)=122.5\dfrac{(a+24) + a}{a(a+24)} = \dfrac{1}{22.5}

or, 2a+24a(a+24)=122.5\dfrac{2a + 24}{a(a+24)} = \dfrac{1}{22.5}

or, 22.5(2a+24)=a(a+24)22.5(2a + 24) = a(a+24)

or, 45a+540=a2+24a45a + 540 = a^2 + 24a 

or, a2−21a−540=0a^2 - 21a - 540 = 0

or, a=21±212+4⋅5402a = \dfrac{21 \pm \sqrt{21^2 + 4 \cdot 540}}{2}

or, a =21±441+21602=21±26012 =21±512a = \dfrac{21 \pm \sqrt{441 + 2160}}{2}= \dfrac{21 \pm \sqrt{2601}}{2} = \dfrac{21 \pm 51}{2}

Since, the number of days cannot be negative, so a=722=36daysa = \dfrac{72}{2} = 36 \text{days}

Tagged Cubic and higher degree polynomial equations. Machine-assigned, so read it as a strong shortlist rather than a verdict.

TopicCubic and higher degree polynomial equations
TypeMultiple choice